Authorizes the Secretary of the Interior to design, construct, operate, and maintain the following features of the Yakima Enhancement Project: (1) modification of existing radial gates at Cle Elum Dam; (2) a Kachess Lake to Keechelus Lake pipeline; (3) a reregulating reservoir of the Roza Division; and (4) facilities to automate and otherwise improve canal operations of the Sunnyside Division and the Wapato Indian Project. Authorizes appropriations. Requires non-Federal interests to fund 35 percent of construction costs.
Authorizes appropriations to the Secretary for a feasibility study of certain other potential elements of the Yakima Enhancement Project.
Referred to Subcommittee on General Oversight, Northwest Power, and Forest Management.
Introduced in Senate
Read twice and referred to the Committee on Energy and Natural Resources.
Referred to Subcommittee on Water and Power.
Subcommittee on Water and Power. Hearings held.
checking server…
Ask anything about this bill. The AI reads the full text to answer.
Enter to send · Shift+Enter for new line