Authorizes the Secretary of the Interior to design, construct, operate, and maintain the following features of the Yakima Enhancement Project: (1) modification of existing radial gates at Cle Elum Dam; (2) a Kachess Lake to Keechelus Lake pipeline; (3) a reregulating reservoir of the Roza Division; and (4) facilities to automate and otherwise improve canal operations of the Sunnyside Division and the Wapato Indian Project. Authorizes appropriations. Requires non-Federal interests to fund 35 percent of construction costs.
Authorizes appropriations to the Secretary for a feasibility study of certain other potential elements of the Yakima Enhancement Project.
Introduced in House
Introduced in House
Referred to House Committee on Interior and Insular Affairs.
Referred to Subcommittee on General Oversight, Northwest Power, and Forest Management.
Llama 3.2 · runs locally in your browser
Ask anything about this bill. The AI reads the full text to answer.
Enter to send · Shift+Enter for new line