Authorizes the Secretary of the Interior to construct and test the Lake Meredith Salinity Control Project, New Mexico and Texas, to improve the quality of water to the Canadian River downstream of Ute Reservoir, New Mexico, and entering Lake Meredith, Texas.
Authorizes the Secretary to contract with the Canadian River Municipal Water Authority of Texas (Authority) for the design and construction management of project facilities by the Bureau of Reclamation and for the payment of construction costs by the Authority. Makes the Authority responsible for operating and maintaining facilities upon completion of construction and testing.
Requires the Authority to advance all costs of construction of project facilities as the non-Federal contribution. Declares the Federal share to be all project costs for verification, design preparation, and construction management.
Provides for transferring control of the project works to the Authority (or to a bona fide entity agreeable to New Mexico and Texas) upon completion of construction and testing, or upon termination of activities at the request of the Authority.
Authorizes appropriations.
Introduced in House
Introduced in House
Referred to the House Committee on Interior and Insular Affairs.
Subcommittee Hearings Held.
Referred to the Subcommittee on Water, Power and Offshore Energy Resources.
See H.R.429.
Llama 3.2 · runs locally in your browser
Ask anything about this bill. The AI reads the full text to answer.
Enter to send · Shift+Enter for new line