Authorizes the Secretary of the Interior to construct, operate, and maintain the Lake Andes-Wagner Unit, South Dakota Pumping Division, Pick-Sloan Missouri River basin program, South Dakota, for the purpose of providing irrigation water.
Requires such unit to be integrated physically and financially with other Federal works under the Flood Control Act. Directs that user repayment of construction costs of the irrigation project will be based upon ability to pay as determined by the Secretary.
Authorizes appropriations.
Introduced in Senate
Read twice and referred to the Committee on Energy and Natural Resources.
checking server…
Ask anything about this bill. The AI reads the full text to answer.
Enter to send · Shift+Enter for new line