Amends the Federal Power Act to authorize the Federal Power Commission to waive licensing requirements connected with a permit, license, or exemption for an existing or proposed water project with a total installed capacity, upon completion, of 15 megawatts or less.
Introduced in Senate
Read second time and referred to Senate Committee on Energy and Natural Resources.
checking server…
Ask anything about this bill. The AI reads the full text to answer.
Enter to send · Shift+Enter for new line