Modifies the project for hurricane flood protection at New London, Connecticut, to (1) delete the Powder Island-Bentleys Creek hurricane protection barrier; and (2) authorize construction of the Shaw Cove hurricane protection barrier in accordance with the revised plan of the Chief of Engineers.
Requires that appropriate non-Federal interests agree to specified conditions relating to operation and construction of the project. Stipulates that the non-Federal share shall amount to 30 percent of the total first cost for the project.
Referred to Senate Committee on Public Works.
Introduced in House
Introduced in House
Referred to House Committee on Public Works and Transportation.