Directs the Secretary of the Army to: (1) carry out restoration projects along the Middle Rio Grande in New Mexico, from Cochiti Dam to the headwaters of the Elephant Butte Dam; and (2) consult with certain local environmental groups in carrying out such projects. Requires non-federal interests to pay 25% of total project costs and 100% of operation, maintenance, repair, replacement, and rehabilitation costs. Prohibits recreational features of a project from comprising more than 30% of the total project cost.
Introduced in Senate
Sponsor introductory remarks on measure. (CR S773)
Read twice and referred to the Committee on Environment and Public Works. (text of measure as introduced: CR S773-774)