Directs the Federal Energy Regulatory Commission to: (1) reinstate a specified license for an Ohio hydroelectric project at the licensee's request, effective September 25, 1993; and (2) extend the time period during which such licensee is required to commence project construction so that the period terminates on September 24, 1999.
Introduced in Senate
Sponsor introductory remarks on measure. (CR S1456)
Read twice and referred to the Committee on Energy and Natural Resources.
Referred to Subcommittee on Energy Production and Regulation.
checking server…
Ask anything about this bill. The AI reads the full text to answer.
Enter to send · Shift+Enter for new line